Reference

Technical audit
9 MWp ground-mounted power plant

  • Tractebel Engineering (Germany) for an energy producer (confidential)
  • 2024
  • 9 MWp ground-mounted connected to the 20 kV grid
  • Technical audit as part of the buyout of the PV power plant
  • Site inspection and preparation of list of reservations in coordination with EPC contractor
  • Review of test and commissioning protocols and verification of documentation
  • Analysis of performance tests during provisional acceptance and verification of contractual conditions with a view to issuing the acceptance certificate